Abstract
As part of the of the construction of the Springville Spanish Fork Interchange the East Frontage Road needs to be realigned. An in‐depth design and a 3D model of the East Frontage Road was done using Bentley’s Open Roads Designer. The design was done for Horrocks Engineers in conjunction with a larger project being preformed for the Utah Department of Transportation (UDOT). Some of the challenges in realigning the East Frontage Road included it’s proximity to the I‐15 northbound entrance ramp, flat terrain, proximity to Dry Creek and maintaining access to surrounding properties.